Snapshot of C-Stores completed in 2014

These photographs feature a selection of the C-Stores that were designed, manufactured and installed for major food retailers by Global-MSI during 2014.

Each building was supplied with a steel frame, composite panelled roof & wall systems, shop-front glazing & doors. The Global-MSI design allows faster installation times than traditional wet trades, enabling a watertight envelope to be achieved earlier, and shorter overall construction times. The method also enables installation work to continue during weather conditions that may otherwise prevent brick / block laying, providing an overall time & cost saving to the Client.