Building extension for Motor Fuel Group

In January 2026 Global-MSI completed the design, manufacture & installation of the sales building extension at MFG’s Coalville petrol station in Leicestershire. Global-MSI supplied the original sales building in 2018 and access to the original drawings was a significant benefit, reducing design complexity, cost, and programme duration.