C-Store building completed for MFG

In March 2022 Global-MSI completed the installation of the forecourt building at the Motor Fuel Group petrol station in Kings Langley, Hertfordshire. The work included the design & installation of the steel frame, the cladding systems to roof & walls and the imitation timber feature panels to the front elevation. Difficulties such as the restricted site access were overcome by the management team liaising closely with the main contractor.

 

 

joker123 online casino malaysia minyak dagu mega888 apk pussy888 xe88 joker123 super 8 ways ultimate live casino malaysia live22 malaysia mega888 apk 免费电影 casino malaysia 918kiss