In March 2025, Global-MSI completed the design, manufacture & installation of the forecourt sales building at Shell Sutton Elms petrol station in Broughton Astley, Leicestershire.
Additionally, the existing forecourt canopy was altered by removing the ‘link’ and strengthening the structure to accept the MVI pecten, as well as being refurbished with new sheeting. Once again, access to the original canopy drawings in Global-MSI’s substantial & unique archive of forecourt structures, proved invaluable when assessing the proposed alterations, and during the site work.
All aspects of the project were completed within the required programme duration and to the highest quality and safety standards.





