Global-MSI was delighted to be awarded the contract to provide an extension to the forecourt building at Motor Fuel Group’s Bridgwater Express Park Services. The extension comprises storage for the existing Subway facility as well as a new GREGGS servery.
Global-MSI designed and installed the steel frame, insulated cladding system, bullnosed feature fascias, shopfront extension and new security doors.
Access to the construction drawings for the original building in Global-MSI’s comprehensive archive of forecourt structure designs, proved invaluable for the accurate design interface between existing and new structures. This together with close project management throughout ensured a high quality delivery that was well received by the Customer.