Global-MSI completed the installation of a new sales building for MFG at their Walkers Clock petrol station in Telford. The sales building was supplied with steel frame, composite cladding panels, shopfront package, steel personnel doors and fibre cement cladding with wood textured finish.
Global-MSI also altered the existing canopy, by removing the link to the sales building and raising the height, as well as providing replacement gutters, roof sheeting and underlining.